Abstract

Fusobacterium are anaerobic gram-negative bacteria that have been associated with a wide spectrum of human infections and diseases. As the biology of Fusobacterium is still not well understood, comparative genomic analysis on members of this species will provide further insights on their taxonomy, phylogeny, pathogenicity and other information that may contribute to better management of infections and diseases. To facilitate the ongoing genomic research on Fusobacterium, a specialized database with easy-to-use analysis tools is necessary. Here we present FusoBase, an online database providing access to genome-wide annotated sequences of Fusobacterium strains as well as bioinformatics tools, to support the expanding scientific community. Using our custom-developed Pairwise Genome Comparison tool, we demonstrate how differences between two user-defined genomes and how insertion of putative prophages can be identified. In addition, Pathogenomics Profiling Tool is capable of clustering predicted genes across Fusobacterium strains and visualizing the results in the form of a heat map with dendrogram.

Database URL:http://fusobacterium.um.edu.my.

Introduction

Fusobacterium is a genus of gram-negative anaerobic non-sporulating bacteria in which individual cells are rod-shaped with tapered ends (1). Fusobacterium spp. are part of the normal flora of humans and animals. In humans, Fusobacterium nucleatum is widely present in the oropharynx and gastrointestinal tracts (2, 3). However, there is strong evidence that Fusobacterium spp. contributed to a variety of diseases. The majority of research has focused on the role of Fusobacterium spp. in gingivitis and periodontitis, where F.nucleatum is thought to play a role in recruiting periodontal pathogens into subgingival dental plaque. Periodontitis is a risk factor for preterm birth, and there is evidence that maternal oral strains of F. nucleatum are involved (4). Fusobacterium spp. can occasionally cause localized infections such as tonsillitis, para-tonsillar abscess or dental sepsis or invasive disease, including septicemia, abscesses of the brain, liver or lung or Lemierre’s syndrome, a septic thrombophlebitis of the internal jugular vein that is often associated with oropharyngeal infection (5, 6). Fusobacterium spp. are also considered major pathogens in noma (cancrum oris), a devastating facial infection that occurs in conditions of poverty and malnutrition, most commonly in sub-Saharan Africa (7). Invasive infections most commonly caused by Fusobacterium necrophorum, are included under the broad term of ‘invasive F.necrophorum disease’, which is a rare condition occurring to previously healthy young people, while the factors triggering the invasive process are still unclear (8). Recently, Fusobacterium has gained widespread attention for its association with colorectal cancer (9–11), with studies suggesting that these bacteria may have a fitness advantage in the evolving tumor microenvironment. Apart from that, Fusobacterium may also be associated with inflammatory bowel diseases, which is a known risk factor for colorectal cancer (12, 13).

With advances in sequencing technology, many genomes of Fusobacterium spp. have been sequenced by researchers around the globe (14–19). It is expected that the number of sequenced genomes will rapidly increase especially when sequencing costs further reduce. Analysis carried out by Cole and coworkers showed that the importance of comparative genomic analysis on these sequenced strains may provide further insights on their phylogeny, pathogenicity and other information that may contribute to better management of diseases caused by bacteria (20).

The collection of bacterial genomes into a single database is a new trend to analyze their genomes effectively. In recent years, many specialized genomic databases have been developed, especially for human disease pathogens. Examples of these are Mycobacterium abscessus genome and annotation database (MabsBase) (21), Pseudomonas genome database (22, 23), Mycobacterium genome polymorphism and gene function studies database (MyBASE) (24), Cyanobacteria genome database (CyanoBase) (25–27) and many other useful databases. However, there is no such specialized genomic database available for Fusobacterium spp. even though this genus has been the subject of much research and many Fusobacterium genome sequences are available because of the blooming of the next-generation sequencing era (28).

There are a number of databases, including, for instance, the microbial genome database for comparative analysis (29–31) and the integrated microbial genomes (32–35) system, which provide a wide array of microbial genomes including some Fusobacterium strains for comparative genomics. However, these databases do not focus on virulence factors for comparative pathogenomics. Another concern regarding most of the existing biological databases is the lack of user-friendly Web interfaces, for example, allowing real-time and fast querying and browsing of genomic data.

To facilitate the comparative analysis between strains or species of Fusobacterium, we have set up a user-friendly database, FusoBase, completed with genome sequences and annotation of Fusobacterium spp. We also aim to provide resources for whole-genome sequences and annotations and advanced bioinformatics tools specifically designed to support the expanding Fusobacterium research community.

Methods and Results

Overview of the database

Currently, FusoBase comprises 31 genome sequences from seven species of the Fusobacterium genus obtained and downloaded from National Center for Biotechnology Information (NCBI) Web site (http://www.ncbi.nlm.nih.gov) as shown in Table 1 .

Table 1.

List of Fusobacterium species in FusoBase

No.SpeciesNumber of draft genomesNumber of complete genomes
1Fusobacterium gonidiaformans20
2Fusobacterium mortiferum10
3F. necrophorum60
4F. nucleatum294
5Fusobacterium periodonticum40
6F. ulcerans20
7F. varium10
8Fusobacterium russii10
9Fusobacterium sp.50

For consistency, all of these sequenced genomes of Fusobacterium genus were annotated using the Rapid Annotation using Subsystem Technology (RAST) server (36). RAST server is a well-established and automated annotation pipeline for complete or incomplete archaeal and bacterial genomes, which identifies protein-encoding genes, rRNA and tRNA genes. This pipeline is also able to produce high-quality assessment of gene functions and generate initial metabolism reconstruction. Integration of FIGfams (37) and a subsystem approach to annotation produces two classes of asserted gene functions: subsystem-based assertions, which are based on recognition of functional variants of a subsystem, and non-subsystem-based assertions that are filled in using more common approaches based on integration of evidence from a number of tools (38). The predicted open reading frame (CDS) sequences and their annotations were then downloaded from the RAST server. All the annotations including genes, RNAs and predicted protein functions of Fusobacterium strains were stored in our MySQL database server. The protein-coding genes were further analyzed to obtain information such as calculation of GC content (%), predicted hydrophobicity (pH), subcellular localization and molecular weight (Da) of the encoded proteins using in-house Perl script.

FusoBase implementation

The Web application was developed based on 4-tier Web application architecture (Figure 1). The Web server is built on top of Ubuntu Lucid 10.04 by OpenPanel—an open-source Web server control panel. As far as data tier is concerned, MySQL 14.12 is used as a database. A combination of PHP 5.3 and Perl 5 languages for development, Codeigniter 2.1.3 framework for Web tier and Twitter Bootstrap front-end framework for presentation layer were used.

Four Tier Web application architecture of FusoBase.
Figure 1.

Four Tier Web application architecture of FusoBase.

To manage the different analytical tasks performed through BLAST, virulence factor database (VFDB) BLAST, Pairwise Genome Comparison (PGC) and Pathogenomics Profiling Tool (PathoProT), a job scheduling system was used to manage job execution and the application server utilization (39). Currently, the job queuing is of the type first in first out (FIFO). We have practiced different security services and filters, Web server and database management tools to achieve higher levels of scalability, performance, reliability and security.

Our architecture allows users with different kinds of computing devices to access and submit their jobs using the front-end provided securely by the Web server via Internet. The submitted jobs are pushed to the Cluster server, which acts as the application server, which in turn manages the jobs using a job scheduler to enable rapid processing of the jobs. In any case, whether the users interact with the Web site to submit a job or search or browse for data, the required portion of data is retrieved from the database in a fast and secure manner. This has been done by designing a highly normalized and optimized database schema.

Browsing Fusobacterium strains

The browse page of this database summarizes a list of seven Fusobacterium spp., whereby users can obtain strain-specific information such as the genome size, CDSs, number of tRNAs and rRNAs and GC content (Figure 2). Hyperlinks are provided in the details section, for strain name, ORF ID and contig ID, providing links to the Web page at NCBI (40–42), enabling the users to find more information about the strains.

Browsing Fusobacterium strains. (A) Front page of FusoBase. (B) Overview of Fusobacterium species. (C) Overview of strains of F. nucleatum species. (D) List of putative ORFs in F. nucleatum ATCC10953. (E) ORF details page of the F. nucleatum ATCC10953.
Figure 2.

Browsing Fusobacterium strains. (A) Front page of FusoBase. (B) Overview of Fusobacterium species. (C) Overview of strains of F. nucleatum species. (D) List of putative ORFs in F. nucleatum ATCC10953. (E) ORF details page of the F. nucleatum ATCC10953.

The ORF list of each strain is accessible by clicking the ORF link of the desired strain. Detailed information of an ORF such as its ORF ID, type, function or subsystem classification and its start and stop positions are available with the built-in Jbrowse (43) to enable users to further visualize the ORF within a particular contig. Alternatively, users can perform a quick search for information under the database search tab by applying query filters for strain type, ORF ID or relevant keywords, without having to scroll through the full list of available strains.

Real-time data searching feature

Annotated features in FusoBase can be obtained in different ways. We have integrated a powerful real-time AJAX-based search function in the ‘Search’ tool in FusoBase home page. The search parameters include species, strain, ORF ID, keywords of functional classification and type of sequence. Users can search the whole database by selecting a specific species name, which will display all the strains of corresponding species. From there, filtration can be done specifically according to the ORF ID, contig ID or functional classification as shown in Figure 3. The system will then retrieve the matches in real time as soon as users input the desired keywords. The search function has been designed to speed up the searching and getting the right keywords, especially when dealing with a large data set.

Real-time data searching system.
Figure 3.

Real-time data searching system.

Genome comparison and visualization with PGC tool

As mentioned in the previous sections, many genomes of Fusobacterium spp. have already been sequenced by different researchers around the globe, and many more of the newly sequenced Fusobacterium genomes are expected to become available soon. With an organism like Fusobacterium, which is so widely distributed in humans and many of its species already being associated with a variety of diseases, we still do not have a clear understanding of its biology. Genomic information from a single Fusobacterium genome is not enough, for giving us a clear picture of the lifestyle and extended view of the gene pool of the species. A comparative study of multiple Fusobacterium genomes could provide us with a highly detailed view of the relatedness and the variations between the organisms at the genetic level, giving us a better understanding about their physiology. Comparative genomic analysis of the Fusobacterium genomes will enable us to study the evolutionary changes among organisms, identify the orthologous genes in species, as well as genes that give each organism its unique characteristics, explore the genetic differences, e.g. indels and rearrangements between two genomes either inter- or intraspecies, evolutionary signals and potential regions associated with pathogenicity.

With that in mind, the PGC tool was developed and incorporated into FusoBase. This unique analysis tool will allow the users to compare and visualize two genomes of interest. In the Tool’s page, researchers can select the genomes of two Fusobacterium strains of interest and compare them with the PGC tool. Alternatively, users can upload their own genome sequence and compare with one of the strains in FusoBase through our custom submission form. One of these genomes will be considered as a reference genome, while the other one will be labeled as query genome for comparison purposes.

The PGC tool is a consolidated tool aligning whole-genome sequences using the NUCmer program of MUMmer package (44) and Circos (45) for visualization of pairwise comparison between two cross-strain/species. Right after the alignments are generated through NUCmer, PGC tool immediately parses the results to Circos, which will then generate a circular ideogram layout to show the relationship between pairs of positions, with karyotypes and links encoding the position, size and orientation of the related genomic elements. The multi-step process of this pipeline was automated using Perl scripts and the results can be visualized in just a few minutes. The results generated by the PGC tool, both the NUCmer results and the Circos plot along with a help file can be downloaded using the ‘Download’ button in the PGC result page. Supplementary Figure S1 briefly illustrates the work flow of PGC tools describing the integration of both MUMmer and Circos, generating the required input files for the PGC to function.

PGC allows users to configure parameters, such as (i) minimum percent genome identity (%), (ii) link threshold (LT; bp), which removes the links according to user-defined value and (iii) merge threshold (MT; bp), which allows merging of links based on user-defined value. By default, the thresholds of the PGC tool are set to be 95% minimum percent identity and 1000 bp LT. The users may change the parameter freely to get different comparative results. The influences of different parameters on the comparative results and the display of the aligned genomes are shown in Figure 4. Apart from these parameters, users can input their email addresses for the analysis result to be sent directly to their emails once the analysis is completed by the PGC pipeline.

The influence of different cutoffs of minimum percent identity (%), LT and MT on the final output of PGC.
Figure 4.

The influence of different cutoffs of minimum percent identity (%), LT and MT on the final output of PGC.

Development of PGC is inspired by similar tools, like Circoletto (46) and RCircos (47). Designed to excel more than these tools, PGC has some distinct advantages over these online tools. Compared with Circoletto, which aligns desired sequences using BLAST (local alignment); the alignment algorithm used in PGC is based on the NUCmer (global alignment) package in MUMmer, which is more suitable for large-scale and rapid genome alignment (44, 48). Apart from that, PGC provides users with options for adjusting settings such as minimum percent genome identity (%), merging of links/ribbons according to MT and the removal of links according to the user-defined LT through the provided online form. Further, a histogram track is added in the circular layout generated by PGC, which shows the percentage of mapped regions along the genomes. This track is useful and helps users to identify putative indels and repetitive regions in the compared genomes. Supplementary Figure S2A shows how the MT works with the merging process by PGC tool, while Supplementary Figure S2B shows how the data in the histogram track is calculated.

Besides the Circoletto, RCircos is another tool with similar function to PGC, which was developed using R packages that comes with R base installation (47). The package supports Circos 2D data track plots such as scatter, line, histogram, heat map, tile, connectors, links and text labels. Each plot was implemented with a specific function, and input data for all functions were data frames, which can be objects read from text files or generated with other R pipelines. PGC has a distinct advantage over RCircos, for PGC provides a user-friendly interface and easy-to-use add-on marks, which unlike RCircos, requires no prior knowledge in programming languages in running the package.

To demonstrate the handy feature of our PGC pipeline, we compared two draft genomes of F.necrophorum 1_1_36S and F.necrophorum ATCC51357, as displayed in Figure 5A. As shown in the Circos plot, the genome comparison revealed some genome differences between the closely related strains. For instance, we have identified a number of white gaps or regions that were not aligned to F.necrophorum ATCC51357. This prompted us to investigate further, and we wanted to find out whether there were any phage-acquired regions in these genomes. To predict the phage-acquired regions in these genomes, we used the online PHAge Search Tool (PHAST) (49). PHAST identified three prophage regions in the genome of F.necrophorum 1_1_36S as shown in Figure 5B. Prophage 1 is a putative incomplete prophage and has a genomic length of 13.6 kb and G+C content of 32.9%. Prophage 2 is an intact or complete prophage with a genomic length of 44.1 kb and G+C content of 36.5%. Prophage 3 is also an intact prophage observed in this genome with G+C content of 32.06% Figure 5B. Interestingly, when we correlated the PHAST results with the Circos plot as obtained from the analysis using our PGC tool, we found that the predicted prophage 1 was in the aligned region whereas the predicted intact prophage 2 covered a region encompassing both aligned and unaligned regions. However, the predicted intact prophage 3 is present in the white gaps or unaligned regions in the F. necrophorum 1_1_36S (Supplementary Table S1). Taken together, we have shown that our PGC tool is effective in showing the relatedness and differences between two Fusobacterium genomes.

Comparison between two genomes using PGC reveals putative prophages. (A) Visualization of two aligned draft genomes, F. necrophorum 1_1_36S and F. necrophorum ATCC51357 revealing three insertions in the F. necrophorum 1_1_36S genome, which are associated with putative prophages as predicted by PHAST. (B) Overview of the CDSs in the putative prophages.
Figure 5.

Comparison between two genomes using PGC reveals putative prophages. (A) Visualization of two aligned draft genomes, F. necrophorum 1_1_36S and F. necrophorum ATCC51357 revealing three insertions in the F. necrophorum 1_1_36S genome, which are associated with putative prophages as predicted by PHAST. (B) Overview of the CDSs in the putative prophages.

Identification and comparative analysis of virulence genes with PathoProT

Virulence can be defined as a quantitative measure of the pathogenicity or the likelihood of causing disease and is the means by which pathogenic organisms express their pathogenicity. Virulence factors or genes are referred to as are any of the genetic or biochemical or structural features that enable the pathogenic organism to establish itself on or within a host and increase its chances of causing disease. These factors can be broadly divided into two major modes of pathogenesis, one of which is toxigenesis (bacterial toxins both exotoxins and endotoxins) and the other invasiveness, which includes cell surface proteins mediating bacterial attachment, extracellular substances that facilitate invasion (invasins), cell surface carbohydrates and proteins that protect a bacterium to bypass or overcome host defence mechanisms and also hydrolytic enzymes that may contribute to the pathogenicity of the bacterium (50–52). The acquisition of individual virulence factors may convert nonpathogenic bacteria into pathogens (53). To identify genes that express virulence factors, PathoProT was developed. PathoProT is a pipeline developed using in-house Perl and R scripts. All the virulence factors from different pathogenic organisms, which have been experimentally verified, are curated in the VFDB. These virulence factors retrieved from VFDB (VFDB Version 2012 containing 19 775 proteins) for PathoProT are considered as the ‘known virulence factors’. In the PathoProT pipeline, the orthologs of these known virulence factors are identified in the Fusobacterium genomes present in the FusoBase by BLAST search with the default parameters of 50% sequence identity and 50% sequence completeness. However, these default parameters for the BLAST search can be changed by the user depending on their desired levels of stringency. The orthologs thus identified in the Fusobacterium genomes are the ‘predicted virulence genes’. The predictions of these orthologs are done through the use of the well-established BLAST (Stand-alone) tool of NCBI (39, 54–56), which is downloaded from NCBI and embedded in the pipeline of PathoProT. The Perl script handles the early process, where it is programmed to filter the BLAST results generated from BLAST search against VFDB and selects only the user-desired strains. The selected results are then structured into a data matrix form, in which the correlation between strain/genomes and the virulence genes are displayed. The Perl scripts then manipulate the data frame by assigning 1 and 0 values for ‘presence’ and ‘absence’ of virulence genes, respectively. The data frame is then converted into a data matrix, and the initial result will be passed to the R script, generating hierarchical clustering of the virulence genes and producing a heat map of multiple virulence gene profiles. Supplementary Figure S3 shows the flow chart of PathoProT, briefly describing the pipeline, which integrates both Perl script and R script, and the processes before generating the output file.

On testing, PathoProT predicted all the known virulence genes based on the pathogenomic composition of the genomes by clustering predicted virulence genes across different selected strains. The final output is generated in the form of a heat map, combined with side-by-side dendrograms (Figure 6) giving a bird’s eye view of the distribution of the virulence genes across Fusobacterium spp. The combination of heat map and dendrogram shows a neat overview of the clustered strains, which have closely related sets of virulence genes present in each group of clustering. In addition, the strains are sorted according to the level of similarities across the strains and virulence genes. Seven virulence genes, plr/gapA, C8J, lpxA, kdsA, acpXL, galE and BC5263, are found to be widely distributed across all the Fusobacterium spp., whereas other virulence genes are less widely distributed. From the generated heat map, we can clearly identify that Fusobacterium ulcerans has the most virulence genes, making it potentially the most pathogenic species among all Fusobacterium strains. To enable the user to further analyze the results generated from PathoProT, download options for the BLAST alignment result (.txt), overview of virulence genes (.txt) and the Heat Map (.pdf) are provided.

The heat map generated using PathoProT, showing the cluster of Fusobacterium strains based on their virulence gene profiles. The threshold used in this analysis was 50% sequence identity and 50% sequence completeness.
Figure 6.

The heat map generated using PathoProT, showing the cluster of Fusobacterium strains based on their virulence gene profiles. The threshold used in this analysis was 50% sequence identity and 50% sequence completeness.

Identification of these virulence traits of Fusobacterium spp. are often attributable to the use of comparative pathogenomics approaches, which improve comprehension of the virulence nature and evolution, allowing new therapeutic and preventive solutions to be all the more possible (57, 58). As demonstrated, PathoProT can be used to identify virulence genes in Fusobacterium strains by sequence homology. Moreover, comparative pathogenomics analysis can be easily performed to compare strains/groups of strains e.g. nonpathogenic strains versus pathogenic strains, giving better insights into the biology, evolution and virulence of the Fusobacterium strains of interest.

Other tools

BLAST is the foundation tool for providing alignment information and findings for genomic differences through sequence similarity search is incorporated into the FusoBase. BLAST is an algorithm to compare query sequence with a library of databases of sequence, and identify library sequences that resemble the query sequence above a certain threshold value (39, 54). In FusoBase, two different BLAST searches are provided. A standard BLAST interface, with different BLAST search options: BLASTN (CDS nucleotide sequences), BLASTN (Fusobacterium whole-genome sequences), BLASTP and BLASTX (Supplementary Figure S4). Besides the standard BLAST searches, there is also a VFDB BLAST (50–52). The incorporation of VFDB BLAST into FusoBase enables users to identify whether their genes of interest are potential virulence genes based on sequence homology.

Another tool implemented in FusoBase is JBrowse, a fast and modern JavaScript-based genome browser (43). JBrowse can be used to navigate genome annotations over the Web and helps preserve the user’s sense of location by avoiding discontinuous transitions, offering smooth animated panning, zooming, navigation and track selection. It uses the information of the start and end location, predicted function and subsystem information to display the strand and provides information on it. JBrowse is integrated into FusoBase to ensure high-speed visualization of selected Fusobacterium strains, which refreshes and reloads the Web page as soon as user changes the input strains. The genome browser provides three user-defined options (in the dropdown menu), for the selection of species, strains and contig. Integration of JBrowse inside FusoBase enables visualization of contigs, DNA sequences, RNA sequences and genome annotation results (Supplementary Figure S5).

Protein subcellular localization analysis

Subcellular localization prediction of predicted proteins was analyzed using the latest PSORTb version 3.0, which categorizes the proteins with high-confidence subcellular scores (59, 60). Preliminary analysis revealed that these Fusobacterium proteins can be categorized into the following five categories of, cytoplasmic, cytoplasmic membrane, extracellular, outer membrane and periplasmic (Supplementary Figure S6). Based on the analysis performed, more than half of these Fusobacterium proteins (55.9%) were predicted to be localized in cytoplasm. Furthermore, a high percentage of these proteins (18.4%) were predicted to be localized in cytoplasmic membrane.

Pan-genome analysis on Fusobacterium genus

The Fusobacterium pan-genome analysis was performed using the genomic and the proteomic data from the FusoBase. The analyses included 30 strains comprising seven different Fusobacterium spp. The genes and proteins sequences for all these strains were downloaded from FusoBase and used as the input for the pan-genome analysis using PGAP (Pan-Genomes Analysis Pipeline) version 1.1 (61).

After clustering all the functional genes from these 30 strains, we identified that of the 14 101 gene clusters, there were only 462 genes that could be considered as core genes, which were shared by all the 30 strains, whereas 13 639 genes (accessory genes) were not shared by all the strains. The low number of core genes suggests that genus Fusobacterium contains a diverse genome structure. After obtaining the number of core and accessory genes, we tried to predict the pan and core genome size of the genus through an extrapolation method. Gene clusters and core clusters for N genomes were calculated, where N is the number of Fusobacterium genomes (N = 1, 2, 3, … 30). For each N genome, the pan-genome size and core genome for each of the permutations of genome comparisons was predicted. The curve for the pan-genome size can be represented by the following mathematical function of Y = 2735.2287 X0.5 + 544.4458 (R2 = 0.99). In the function, Y represents pan-genome size, while X represents number of sequenced genomes. Not surprisingly, the result showed that Fusobacterium genus possesses an open pan-genome and the pan-genome size increased rapidly when the number of genomes increased (Figure 7). This suggested that Fusobacterium is continuously gaining new genes and actively evolving throughout the time frame. This also indicates that Fusobacterium is capable of acquiring new phenotypes through evolution (62).

Pan- and core-genomes size prediction for Fusobacterium. The blue curve denotes the pan-genome size, while the red curve represents the core-genome size. The dot represents every genome comparison with different combination and the median values have been used to draw the curve.
Figure 7.

Pan- and core-genomes size prediction for Fusobacterium. The blue curve denotes the pan-genome size, while the red curve represents the core-genome size. The dot represents every genome comparison with different combination and the median values have been used to draw the curve.

From the accessory genes, we also identified the subgroup specific genes as well as the gene clusters specific to each species as shown in Figure 8. The result shows that F. mortiferum, F. varium and F.ulcerans are the three species with the highest number of unique genes. However, there is only one strain included for F.mortifererum and F.varium in the analysis, and thus, some of the genes may be strain-specific genes and not species-specific genes. Identification of these species-specific genes may be useful, as these genes might become gene markers for each of the Fusobacterium spp.

Gene distributions for the Fusobacterium genus. The circle in the middle denotes the core gene cluster for the Fusobacterium genus, while the seven segments surrounding the circle represent the number of specific genes for each Fusobacterium species.
Figure 8.

Gene distributions for the Fusobacterium genus. The circle in the middle denotes the core gene cluster for the Fusobacterium genus, while the seven segments surrounding the circle represent the number of specific genes for each Fusobacterium species.

Apart from the species-specific genes, we have also identified 7171 strain-specific gene clusters, a number that is more than half of the pan-genome size. The high number of strain-specific genes suggests that Fusobacterium genome exhibits extreme levels of evolutionary plasticity. The distribution of strain-specific genes for the 30 strains of Fusobacterium is shown in Figure 9.

Strain-specific genes for the Fusobacterium genomes. Fusobacterium necrophum 1_1_36S has 1443 strain-specific gene clusters, which is the highest and F. nucleatum F0401 has the lowest, which is 27 gene clusters.
Figure 9.

Strain-specific genes for the Fusobacterium genomes. Fusobacterium necrophum 1_1_36S has 1443 strain-specific gene clusters, which is the highest and F. nucleatum F0401 has the lowest, which is 27 gene clusters.

The continuously evolving nature of the Fusobacterium genomes is clearly evident from the above study. As the pan-genome study indicated, Fusobacterium genomes have an open pan-genome, suggesting that with the availability of new Fusobacterium genomes, we are likely to see an expansion in the number of new Fusobacterium genes. With the availability of constantly updated database of Fusobacterium genomes and its analytical tools, FusoBase would provide a great platform for the researchers to probe into the continuously evolving genus of Fusobacterium.

Discussion

We constructed FusoBase, which stores all genome sequences and genomic information of Fusobacterium strains. These data can be downloaded, browsed and searched with our real-time Ajax searching system. There is also a file transfer protocol (FTP) download option, which will allow the user to batch download the sequence and annotation files. Moreover, the Fusobacterium research community can browse these huge genome data using the modern JBrowse. We have also provided PGC tool, which allows the research community to perform comparative analysis of two genomes of interest and visualize the comparison results. Meanwhile, our PathoProT pipeline allows user to identify potential virulence genes that are present in Fusobacterium genus through the comparison of sequence homology.

To provide the most accurate and detailed information about Fusobacterium genus, FusoBase will be maintained and updated regularly. At the moment, FusoBase comprises seven species of Fusobacterium encompassing 30 strains. From the genomes, we collected 71 030 CDSs, 1662 RNAs and 1436 tRNAs. Apart from that, more analysis tools and Fusobacterium genomic data will be added into FusoBase in the near future.

Future directions

We are already in the process of adding new Fusobacterium genomes to the FusoBase and will be updating the database with new genomes of Fusobacterium as and when they are available. At this moment, the database is optimized for whole-genome analysis. However, we would love to incorporate other data types as well in future. We are working on it, and we also encourage other researchers or research groups to email us at girg@um.edu.my if they wish to share their annotations, opinions and curated data with us. Suggestions for improving this database and requests for additional functions are important to us and are most welcome, as it will help us make this database a comprehensive one.

Availability and system requirements

FusoBase is available online at http://fusobacterium.um.edu.my. All the sequences and annotations described in this article could be viewed and downloaded from the Web site. FusoBase is best viewed by Internet Explorer 8.x or higher, Mozilla Firefox® 10.x or higher, Safari 5.1 or higher, Chrome 18 or higher and any other equivalent browser software. If your browser is older, you may have trouble viewing many of our Web site features properly. This Web site is best viewed at a screen resolution of 1024 × 768 pixels or higher.

Acknowledgements

We would like to thank all members of Genome Informatics Research Group (GIRG) in contributing to this research.

Funding

This project was funded by University of Malaya and Ministry of Education, Malaysia under the High Impact Research (HIR) Grant (UM.C/HIR/MOHE/08) and the Postgraduate Research Grant (PG077-2012B). Funding for open access charge: High Impact Research (HIR) Grant (UM.C/HIR/MOHE/08).

Conflict of interest. None declared.

References

1

Citron
D.M.
Poxton
I.R.
Baron
E.J.
(
2007
)
Bacteroides
, po
rphyromonas, prevotella, fusobacterium, and other anaerobic gram-negative rods
. In:
Murray
P.R.
Baron
E.J.
Landry
M.L.
et al.
.
(eds),
Manual of Clinical Microbiology
.
ASM Press
.,
Washington, DC
, pp.
911
932
.

2

Huse
S.M.
Ye
Y.
Zhou
Y.
et al. . (
2012
)
A core human microbiome as viewed through 16S rRNA sequence clusters
.
PloS One
,
7
,
e34242
.

3

Strauss
J.
Kaplan
G.G.
Beck
P.L.
et al. . (
2011
)
Invasive potential of gut mucosa-derived Fusobacterium nucleatum positively correlates with IBD status of the host
.
Inflamm. Bowel Dis.
,
17
,
1971
1978
.

4

Gonzales-Marin
C.
Spratt
D.A.
Allaker
R.P.
(
2013
)
Maternal oral origin of Fusobacterium nucleatum in adverse pregnancy outcomes as determined using the 16S-23S rRNA gene intergenic transcribed spacer region
.
J. Med. Microbiol.
,
62
,
133
144
.

5

Huggan
P.J.
Murdoch
D.R.
(
2008
)
Fusobacterial infections: clinical spectrum and incidence of invasive disease
.
J. Infect.
,
57
,
283
289
.

6

Kuppalli
K.
Livorsi
D.
Talati
N.J.
et al. . (
2012
)
Lemierre's syndrome due to Fusobacterium necrophorum
.
Lancet Infect. Dis.
,
12
,
808
815
.

7

Enwonwu
C.O.
Falkler
W.A.
Idigbe
E.O.
(
2000
)
Oro-facial gangrene (noma/cancrum oris): pathogenetic mechanisms
.
Crit. Rev. Oral Biol. Med.
,
11
,
159
171
.

8

Brazier
J.S.
(
2006
)
Human infections with Fusobacterium necrophorum
.
Anaerobe
,
12
,
165
172
.

9

Kostic
A.D.
Gevers
D.
Pedamallu
C.S.
et al. . (
2012
)
Genomic analysis identifies association of Fusobacterium with colorectal carcinoma
.
Genome Res.
,
22
,
292
298
.

10

Keku
T.O.
McCoy
A.N.
Azcarate-Peril
A.M.
(
2013
)
Fusobacterium spp. and colorectal cancer: cause or consequence?
Trends Microbiol.
,
21
,
506
508
.

11

McCoy
A.N.
Araujo-Perez
F.
Azcarate-Peril
A.
et al. . (
2013
)
Fusobacterium is associated with colorectal adenomas
.
PloS One
,
8
,
e53653
.

12

Moore
W.E.
Moore
L.H.
(
1995
)
Intestinal floras of populations that have a high risk of colon cancer
.
Appl. Environ. Microbiol.
,
61
,
3202
3207
.

13

Castellarin
M.
Warren
R.L.
Freeman
J.D.
et al. . (
2012
)
Fusobacterium nucleatum infection is prevalent in human colorectal carcinoma
.
Genome Res.
,
22
,
299
306
.

14

Slots
J.
Potts
T.V.
Mashimo
P.A.
(
1983
)
Fusobacterium periodonticum, a new species from the human oral cavity
.
J. Dent. Res.
,
62
,
960
963
.

15

Kapatral
V.
Anderson
I.
Ivanova
N.
et al. . (
2002
)
Genome sequence and analysis of the oral bacterium Fusobacterium nucleatum strain ATCC 25586
.
J. Bacteriol.
,
184
,
2005
2018
.

16

Park
S.N.
Cho
E.
Kim
H.S.
et al. . (
2013
)
Draft genome sequence of Fusobacterium nucleatum subsp. animalis ChDC F324, isolated from a human subgingival plaque in the republic of Korea
.
Genome Announc
.,
1
,
pii: e01042-13
.

17

Park
S.N.
Cho
E.
Kim
H.S.
et al. . (
2013
)
Draft genome sequence of Fusobacterium nucleatum subsp. vincentii chdc F8, isolated from a human subgingival plaque in the republic of Korea
.
Genome Announc
.,
1
,
pii: e01040-13
.

18

Park
S.N.
Cho
E.
Lim
Y.K.
et al. . (
2014
)
Draft genome sequences of Fusobacterium nucleatum ChDC F145, ChDC F174, ChDC F206, and ChDC F300, isolated from human subgingival plaques in the republic of Korea
.
Genome Announc.
,
2
,
pii: e01233-13
.

19

Ang
M.Y.
Dymock
D.
Tan
J.L.
et al. . (
2014
)
Genome sequence of Fusobacterium nucleatum strain W1481, a possible new subspecies isolated from a periodontal pocket
.
Genome Announc.
,
2
,
pii: e00009-14
.

20

Cole
S.T.
(
2002
)
Comparative mycobacterial genomics as a tool for drug target and antigen discovery
.
Eur. Respir. J. Suppl.
,
36
,
78s
86s
.

21

Heydari
H.
Wee
W.Y.
Lokanathan
N.
et al. . (
2013
)
MabsBase: a Mycobacterium abscessus genome and annotation database
.
PloS One
,
8
,
e62443
.

22

Winsor
G.L.
Lam
D.K.
Fleming
L.
et al. . (
2011
)
Pseudomonas genome database: improved comparative analysis and population genomics capability for Pseudomonas genomes
.
Nucleic Acids Res.
,
39
,
D596
D600
.

23

Winsor
G.L.
Van Rossum
T.
Lo
R.
et al. . (
2009
)
Pseudomonas genome database: facilitating user-friendly, comprehensive comparisons of microbial genomes
.
Nucleic Acids Res.
,
37
,
D483
D488
.

24

Zhu
X.
Chang
S.
Fang
K.
et al. . (
2009
)
MyBASE: a database for genome polymorphism and gene function studies of Mycobacterium
.
BMC Microbiol.
,
9
,
40
.

25

Nakamura
Y.
Kaneko
T.
Hirosawa
M.
et al. . (
1998
)
CyanoBase, a www database containing the complete nucleotide sequence of the genome of Synechocystis sp. strain PCC6803
.
Nucleic Acids Res.
,
26
,
63
67
.

26

Nakamura
Y.
Kaneko
T.
Tabata
S.
(
2000
)
CyanoBase, the genome database for Synechocystis sp. strain PCC6803: status for the year 2000
.
Nucleic Acids Res.
,
28
,
72
.

27

Nakao
M.
Okamoto
S.
Kohara
M.
et al. . (
2010
)
CyanoBase: the cyanobacteria genome database update 2010
.
Nucleic Acids Res.
,
38
,
D379
D381
.

28

Metzker
M.L.
(
2010
)
Sequencing technologies–the next generation
.
Nat. Rev. Genet.
,
11
,
31
46
.

29

Uchiyama
I.
(
2003
)
MBGD: microbial genome database for comparative analysis
.
Nucleic Acids Res.
,
31
,
58
62
.

30

Uchiyama
I.
(
2007
)
MBGD: a platform for microbial comparative genomics based on the automated construction of orthologous groups
.
Nucleic Acids Res.
,
35
,
D343
D346
.

31

Uchiyama
I.
Higuchi
T.
Kawai
M.
(
2010
)
MBGD update 2010: toward a comprehensive resource for exploring microbial genome diversity
.
Nucleic Acids Res.
,
38
,
D361
D365
.

32

Markowitz
V.M.
Chen
I.M.
Palaniappan
K.
et al. . (
2010
)
The integrated microbial genomes system: an expanding comparative analysis resource
.
Nucleic Acids Res.
,
38
,
D382
D390
.

33

Markowitz
V.M.
Chen
I.M.
Palaniappan
K.
et al. . (
2012
)
IMG: the integrated microbial genomes database and comparative analysis system
.
Nucleic Acids Res.
,
40
,
D115
D122
.

34

Markowitz
V.M.
Korzeniewski
F.
Palaniappan
K.
et al. . (
2006
)
The integrated microbial genomes (IMG) system
.
Nucleic Acids Res.
,
34
,
D344
D348
.

35

Markowitz
V.M.
Szeto
E.
Palaniappan
K.
et al. . (
2008
)
The integrated microbial genomes (IMG) system in 2007: data content and analysis tool extensions
.
Nucleic Acids Res.
,
36
,
D528
D533
.

36

Aziz
R.K.
Bartels
D.
Best
A.A.
et al. . (
2008
)
The RAST Server: rapid annotations using subsystems technology
.
BMC Genomics
,
9
,
75
.

37

Meyer
F.
Overbeek
R.
Rodriguez
A.
(
2009
)
FIGfams: yet another set of protein families
.
Nucleic Acids Res.
,
37
,
6643
6654
.

38

Aziz
R.K.
Devoid
S.
Disz
T.
et al. . (
2012
)
SEED servers: high-performance access to the SEED genomes, annotations, and metabolic models
.
PloS One
,
7
,
e48053
.

39

Altschul
S.F.
Gish
W.
Miller
W.
et al. . (
1990
)
Basic local alignment search tool
.
J. Mol. Biol.
,
215
,
403
410
.

40

Pruitt
K.D.
Tatusova
T.
Maglott
D.R.
(
2005
)
NCBI Reference Sequence (RefSeq): a curated non-redundant sequence database of genomes, transcripts and proteins
.
Nucleic Acids Res.
,
33
,
D501
D504
.

41

Pruitt
K.D.
Tatusova
T.
Maglott
D.R.
(
2007
)
NCBI reference sequences (RefSeq): a curated non-redundant sequence database of genomes, transcripts and proteins
.
Nucleic Acids Res.
,
35
,
D61
D65
.

42

Pruitt
K.D.
Tatusova
T.
Brown
G.R.
et al. . (
2012
)
NCBI reference sequences (RefSeq): current status, new features and genome annotation policy
.
Nucleic Acids Res.
,
40
,
D130
D135
.

43

Skinner
M.E.
Uzilov
A.V.
Stein
L.D.
et al. . (
2009
)
JBrowse: a next-generation genome browser
.
Genome Res.
,
19
,
1630
1638
.

44

Delcher
A.L.
Salzberg
S.L.
Phillippy
A.M.
(
2003
)
Using MUMmer to identify similar regions in large sequence sets
.
Curr. Protoc. Bioinformatics
,
Chapter 10, Unit 10 13
.

45

Krzywinski
M.
Schein
J.
Birol
I.
et al. . (
2009
)
Circos: an information aesthetic for comparative genomics
.
Genome Res.
,
19
,
1639
1645
.

46

Darzentas
N.
(
2010
)
Circoletto: visualizing sequence similarity with Circos
.
Bioinformatics
,
26
,
2620
2621
.

47

Zhang
H.
Meltzer
P.
Davis
S.
(
2013
)
RCircos: an R package for Circos 2D track plots
.
BMC Bioinformatics
,
14
,
244
.

48

Kurtz
S.
Phillippy
A.
Delcher
A.L.
et al. . (
2004
)
Versatile and open software for comparing large genomes
.
Genome Biol.
,
5
,
R12
.

49

Zhou
Y.
Liang
Y.
Lynch
K.H.
et al. . (
2011
)
PHAST: a fast phage search tool
.
Nucleic Acids Res.
,
39
,
W347
W352
.

50

Chen
L.
Yang
J.
Yu
J.
et al. . (
2005
)
VFDB: a reference database for bacterial virulence factors
.
Nucleic Acids Res.
,
33
,
D325
D328
.

51

Yang
J.
Chen
L.
Sun
L.
et al. . (
2008
)
VFDB 2008 release: an enhanced web-based resource for comparative pathogenomics
.
Nucleic Acids Res.
,
36
,
D539
D542
.

52

Chen
L.
Xiong
Z.
Sun
L.
et al. . (
2012
)
VFDB 2012 update: toward the genetic diversity and molecular evolution of bacterial virulence factors
.
Nucleic Acids Res.
,
40
,
D641
D645
.

53

Hensel
M.
Shea
J.E.
Gleeson
C.
et al. . (
1995
)
Simultaneous identification of bacterial virulence genes by negative selection
.
Science
,
269
,
400
403
.

54

McGinnis
S.
Madden
T.L.
(
2004
)
BLAST: at the core of a powerful and diverse set of sequence analysis tools
.
Nucleic Acids Res.
,
32
,
W20
W25
.

55

Camacho
C.
Coulouris
G.
Avagyan
V.
et al. . (
2009
)
BLAST+: architecture and applications
.
BMC Bioinformatics
,
10
,
421
.

56

Tao
T.
(
2010
)
Standalone BLAST Setup for Windows PC
. In:
BLAST® Help [Internet]
,
National Center for Biotechnology Information (US)
,
Bethesda, MD
.

57

Rasko
D.A.
Sperandio
V.
(
2010
)
Anti-virulence strategies to combat bacteria-mediated disease
.
Nat. Rev. Drug Disc.
,
9
,
117
128
.

58

Wright
G.D.
Sutherland
A.D.
(
2007
)
New strategies for combating multidrug-resistant bacteria
.
Trends Mol. Med
.,
13
,
260
267
.

59

Gardy
J.L.
Spencer
C.
Wang
K.
et al. . (
2003
)
PSORT-B: Improving protein subcellular localization prediction for Gram-negative bacteria
.
Nucleic Acids Res.
,
31
,
3613
3617
.

60

Yu
N.Y.
Wagner
J.R.
Laird
M.R.
et al. . (
2010
)
PSORTb 3.0: improved protein subcellular localization prediction with refined localization subcategories and predictive capabilities for all prokaryotes
.
Bioinformatics
,
26
,
1608
1615
.

61

Zhao
Y.
Wu
J.
Yang
J.
et al. . (
2012
)
PGAP: pan-genomes analysis pipeline
.
Bioinformatics
,
28
,
416
418
.

62

Medini
D.
Donati
C.
Tettelin
H.
et al. . (
2005
)
The microbial pan-genome
.
Curr. Opin. Genet. Dev.
,
15
,
589
594
.

Author notes

Citation details: Ang,M.Y., Heydari,H., Jakubovics,N.S., et al. FusoBase: an online Fusobacterium comparative genomic analysis platform. Database (2014) Vol. 2014: article ID bau082; doi:10.1093/database/bau082

This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted reuse, distribution, and reproduction in any medium, provided the original work is properly cited.

Supplementary data